Hi,
My current FIM 2010 RTM installed on server 2008 and CA's are 2008 R2.
I use FIM CM only.
I have Installed new CA's hierarchy (2012 R2) and copied the certificate templates settings as I needed.
I plan to upgrade to FIM 2010 R2 SP1 on server 2012 R2, from what I could find, the upgrade is supported. but I couldn't find any other documentation about side-by-side migration since I want to install the FIM 2010 R2 SP1 on a fresh vanilla server 2012 R2.
I have several questions regarding the desired configuration:
1. I need to Install FIM RTM on the vanilla server 2012 R2 before installing the FIM 2010 SP1? any documentation/guidelines for FIM upgrade process and DB upgrade will be much appreciated!
2. after the FIM upgrade to 2010 R2 SP1, I'm planning to change the Certificate Template in an existing smart card Profile Template, this certificate template will be from the new (2012 R2) CA's hierarchy. after I will do so, I will be able to renew smart card certificates through this "updated" profile template?
I hope I'm understandable :)
thanks in advance!
Gal